Workers & Resources: Soviet Republic

Workers & Resources: Soviet Republic

67 ratings
Almaraz nuclear power plant
   
Award
Favorite
Favorited
Unfavorite
Building
Buildings (by category): Industrial facility
File Size
Posted
Updated
65.202 MB
8 Sep, 2023 @ 7:46am
24 Feb, 2024 @ 4:35pm
6 Change Notes ( view )

Subscribe to download
Almaraz nuclear power plant

Description
The Almaraz nuclear power plant is a nuclear power plant located in the municipality of Almaraz (province of Caceres), it was the first second generation nuclear power plant built in Spain and belongs to the companies Iberdrola, Naturgy and Endesa that form the Centrales Nucleares Almaraz-Trillo society (CNAT), generates more than 6% of Spanish energy.

It has two 2947 MWth PWR reactors, Unit I entered commercial service on May 1, 1981 and Unit II did so on October 8, 1983. Its cooling system is open circuit to the Arrocampo reservoir on the Tagus River.

Workers needed 100
Profesors needed 40
Maximum electrical production 12000Mwh
Road access 1
Pedestrian access 8
Loading and unloading area 2
High voltage connection 14
Low voltage connection 4
Nuclear fuel store 3t
Nuclear waste store 3t
Water connections 4
Water tank capacity 1200
Sewer connections 4
Sewer tank capacity 1200
Cooling connections 2
Nuclear fuel consumption 0.10t
water consumption 25 m3
Minimum water quality 65%
Factory connections 4

NUCLEAR POWER PLANT (10 phases)

Gravel 128.5
Asphalt 135
Concrete 815.3
Steel 526.5
Bricks 529
Prefab panels 118
Boards 40.5
Mechanical components 74.3
Electronic components 52.8
Workers 28720

COOLING TOWERS (2 phases)

Gravel 132
Asphalt 148
Concrete 211
Steel 92.1
Mechanical components 7.2
Electronic components 1.2
Workers 3319







La central nuclear de Almaraz es una central nuclear situada en el termino municipal de Almaraz (provincia de Caceres),fue la primera central nuclear de segunda generacion construida en España y pertenece a las empresas Iberdrola, Naturgy y Endesa que forman la Sociedad Centrales Nucleares Almaraz-Trillo (CNAT), genera mas del 6% de la energia española.

Tiene dos reactores PWR de 2947 MWth, la Unidad I entro en servicio comercial el 1 de mayo de 1981 y la II lo hizo el 8 de octubre de 1983, Su sistema de refrigeracion es de circuito abierto al embalse de Arrocampo en el rio Tajo.

Trabajadores necesarios 100
Trabajadores formados necesarios 40
Produccion electrica maxima 12000Mwh
Accesos por carretera 1
Accesos peatonales 8
Zonas de carga y descarga 2
Conexiones de alto voltaje 14
Conexiones de bajo voltaje 4
Almacen de combustible 3t
Almacen de residuos 3t
Conexiones de agua 4
Capacidad de depositos de agua 1200
Conexiones de alcantarillado 4
Capacidad de depositos de alcantarillado 1200
Conexiones de refrigeracion 2
Consumo de combustible nuclear 0.10t
Consumo de agua 25 m3
Calidad de agua minima 65%
Conexiones de fabrica 4

CENTRAL NUCLEAR (10 fases)

Grava 128.5
Asfalto 135
Hormigon 815.3
Acero 526.5
Ladrillos 529
Paneles prefabricados 118
Tablones 40.5
Componentes mecanicos 74.3
Componentes electronicos 52.8
Dias de trabajo 28720

TORRES DE REFRIGERACION (2 fases)

PREPARATORIOS

Grava 132
Asfalto 148
Hormigon 211
Acero 92.1
Componentes mecanicos 7.2
Componentes electronicos 1.2
Dias de trabajo 3319
13 Comments
gonzaldd  [author] 8 Dec, 2023 @ 1:58pm 
Hola, la verdad es que no se me habia ocurrido y es una buena idea, pero por ahora no, al manos a corto plazo, lo siento.
bacons960 6 Dec, 2023 @ 8:22pm 
Hola de nuevo, disculpa la molestia pero quería preguntarte una cosa si estás pensando hace una fábrica de cemento en España.
gonzaldd  [author] 29 Nov, 2023 @ 3:19pm 
Curioso, hace cuatro dias construi por primera vez su equivalente en el juego y pense que estaria bien hacer una version pequeña de ella.

No obstante a nivel de centrales voy surtido, ahora mismo estoy con la central nuclear de Santa Maria de Garoña (esta acabada al 60-70% mas o menos), y aparte de mas centrales españolas (Vandellos II o Asco, por ejemplo, o la de carbon de As pontes que te comente antes) tambien ya me han pedido que haga alguna mas, como Loviisa, ademas me gustaria hacer tambien alguna de la era sovietica estilo Kursk o Smolensk, por lo que, unido a que son cosas complejas, que llevan tiempo para hacerlas en condiciones lo veo muy dificil que la haga.

No obstante lo pensare, pero ya te digo que las posibilidades son muy bajas y no prometo nada.
bacons960 29 Nov, 2023 @ 8:06am 
https://elnacional.com.do/wp-content/uploads/2023/02/WhatsApp-Image-2023-02-19-at-10.24.56-AM.jpeg?mrf-size=m este es una planta de residuos quema basura para convertirla en energía
Zizo 13 Oct, 2023 @ 2:46am 
Wou! so fast? Thanks a lot!! :)
gonzaldd  [author] 12 Oct, 2023 @ 1:22pm 
I have added four connections, two on each side, let me know if there is any problem.
I have also added them in Vandellos 1 and Zorita.
Zizo 12 Oct, 2023 @ 2:13am 
Ahh such a great looking nuclear powerplant:) I was on first, and second look immediately thinking about replacing my newly build vanilla one for yours, but on third look I found out, that something is missing there to perfection:/ factory connections, at least 2 at the back:/
https://i.postimg.cc/5xHLFhTZ/screenshot-496.png

Like my vanilla is connected to one storage for fuel, one for nuclear waste:
https://i.postimg.cc/4NdmRtTr/screenshot-497.png

I know it has interior storage for both containers, but some people like I do transport them by trains:)So it would be really awesome, if you could add two factory connections, preferably at the back, for example one to the left, one to the right, please! :)

Sorry for my english I hope you get the point:)
gonzaldd  [author] 10 Sep, 2023 @ 6:42am 
Gracias
mthibau 9 Sep, 2023 @ 7:43am 
Bueno Hermano
gonzaldd  [author] 9 Sep, 2023 @ 5:00am 
Ya me gustaria hacer un alto horno, refineria y similares pero son cosas muy complejas y no me veo con el nivel suficiente para hacerlas, lo siento.